In January of 2024, Spirit installed a 6.88 kWp system for Mr D. of Goring. The installation is projected to generate 6.75 mWh of electricity a year, and the addition of a Tesla Powerwall 2 will maximise the efficiency of the investment, allowing the customer to avoid on peak tariffs in the evening by pulling from the Tesla Powerwall which is charged during the day.