Solar PV Case Studies

Theale Quarry - 315 kWp (July '23)

Posted by Spirit Energy on 19 Jan 2024


DJI_0016

In July 2023, Spirit Energy installed a 315 kWp system for returning customer Claude Fenton. This project was at their site at Theale Quarry in Berkshire. With an estimated annual output of 251,760 kWh and a massive 53.37 tonnes of CO2 saved each year, not only is this installation providing cheap electricity to use on site, but the excess is exported back to the grid, further decreasing the payback period for the client.

DJI_0013

 

Share this page

Quick stats
Location Theale, Berkshire
System size 315 kWp
Panel model 742 x Trina 425W
Inverter model Solis -100K-5G
Annual output 251,760 kWh
Annual CO2 savings 53.37 tonnes